It was great to see the progress on the site. The site cut completed and concrete piers are poured.
There are 30 piers in total. I suppose this is due to the cut and fill done on the slope.
|
The concrete company in-charge of slab . |
|
This pier is on the edge of the slab. the empoty space will be filled with the strip footing of 500mm x600 mm. |
|
The membrane used as per BCA. it is pretty thick. |
|
Agi drain. In my opinion Agi drain should be covered with geofabric , which will stop all the soil ,getting into the pipe. But PD said it will covered with the crushed rock which will work as a filter. God knows what is right. |
|
Agi drain instructions. |
|
Agi drain brand |
|
Another picture of piers |