Tuesday 26 August 2014

2nd week of progress

It was great to see the progress on the site. The site cut completed and concrete piers are poured.
There are 30 piers in total. I suppose this is due to the cut and fill done on the slope.
The concrete company in-charge of slab .

This pier is on the edge of the slab. the empoty space will be filled with the strip footing of 500mm x600 mm.


The membrane used as per BCA. it is pretty thick.

Agi drain. In my opinion Agi drain should be covered with geofabric , which will stop all the soil ,getting into the pipe. But PD said it will covered with the crushed rock which will work as a filter. God knows what is right.



Agi drain instructions.

Agi drain brand

Another picture of piers